Fer in the edition of the year. GSN - State estimate standards. Federal collection of machine operation

The Ministry of Construction of Russia pleases us with another change to. The changes affected collections for construction work (9, 13, 27, 29), collections for installation work (m37, m12), as well as collections with prices for machines (FSEM) and materials (FSSC).

Orders of the Ministry of Construction of the Russian Federation on approval of changes

Changes to GESN:

  • No. 1251/pr dated September 25, 2017 – GESNm Collection 37. “General purpose equipment”;
  • No. 1254/pr dated September 25, 2017 – GESN Collection 9. “Building metal structures”;
  • No. 1281/pr dated September 28, 2017 – GESN Collection 66. “External engineering networks”, GESNm Collection 12. “Technological pipelines”;
  • No. 1283/pr dated September 25, 2017 – GESN Collection 13. “Protection of building structures and equipment from corrosion”;
  • No. 1287/pr dated September 28, 2017 – GESN Collection 27. “Highways”;
  • No. 1285/pr dated September 28, 2017 – GESN Collection 29. “Tunnels and subways.”

Changes to FER:

  • No. 1252/pr dated 09/25/2017 – FER Collection 37. “General purpose equipment”;
  • No. 1253/pr dated 09/25/2017 – FER Collection 9. “Building metal structures”;
  • No. 1282/pr dated 09/28/2017 – FER Collection 13. “Protection of building structures and equipment from corrosion”;
  • No. 1284/pr dated 09/28/2017 – FER Collection 29. “Tunnels and subways”;
  • No. 1286/pr dated 09/28/2017 – FER Collection 27. “Highways”;
  • No. 1278/pr dated 09.28.217 - Federal estimated prices for the operation of construction machines and vehicles;
  • No. 1279/pr dated September 28, 2017 - Federal estimated prices for materials, products, structures and equipment used in construction;
  • No. 1280/pr dated 09.28.2017 -FER Collection 66 “External engineering networks”, Collection 12. “Technological pipelines”.

I would also like to note this important detail:

all orders of the Ministry of Construction were approved and entered into the federal register of estimate standards before September 30, 2017, which means that they are used before dates of entering the estimated prices of construction resources into the FSIS CA, i.e. December 15, 2017. What we talked about in the article - “”

List of added standards:

Collection 9"Building metal structures":

  • 09-02-024 - Installation of metal structures of access, maintenance and evacuation means weighing up to 0.3 tons in mine structures up to 40 meters deep;
  • 09-02-025 - Load testing of metal structures of means of access, maintenance and evacuation with a load of up to 600 kg in mine structures up to 40 meters deep;
  • 09-02-026 - Construction of steel volumetric mounting devices in mine structures up to 40 meters deep;

Collection 13“Protection of building structures and equipment from corrosion”

  • 13-06-005 – Hydro-jet cleaning of concrete surfaces;
  • 13-08-013 – Protection of reinforced concrete surfaces of sewer wells using polymer silicate protective compounds (manual and mechanized, 3 mm thick + added for every 3 mm thick);
  • 13-08-014 – Application of paraffin emulsion to care for the protective coating of the surfaces of sewer wells (manual and mechanized methods);
  • 13-02-015 – Installation of fillets at the junction of the walls of sewer wells with the ceiling and with each other using repair compounds 100 mm wide and up to 25 mm thick.

Collection 27"Car roads":

  • 27-07-009 - Installation of drainage trays made of composite polymer materials complete with a grid (lid) on prepared bases (weighing up to 10 kg/m and from 10 kg/m to 30 kg/m);
  • 09/27/008 - Installation of foundationless road signs (on metal posts on a finished base).

Collection 29"Tunnels and subways":

  • 29-01-024 – Tunneling with a tunneling machine with a combined type working device, equipped with a hydraulic hammer and a bucket, with a power of 55 kW (in soils 3,4,5,6,7);
  • 29-01-025 - Tunneling with a tunneling machine with a combined type working device, equipped with a hydraulic hammer and a bucket, with a power of 90 kW (in soils 3,4,5,6,7)

Collection 66"External engineering networks":

  • 66-54 – Repair of reinforced concrete surfaces of sewer wells using sulfate-resistant repair compounds (manual and mechanized, 10 mm thick + added every 5 mm);

Collection m12"Technological pipelines":

  • 12-21-050 - Process pipelines for main pipeline transport facilities for oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 57 mm;
  • 12-21-051 - Process pipelines for main pipeline transport facilities for oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 76 mm;
  • 12-21-052 - Process pipelines for main pipeline transport facilities for oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 89 mm;
  • 12-21-053 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 108 mm;
  • 12-21-054 - Process pipelines for main pipeline transport facilities for oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 133 mm;
  • 12-021-055 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 159 mm;
  • 12-021-056 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 219 mm;
  • 12-21-057 - Process pipelines for main pipeline transport facilities for oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 273 mm;
  • 12-21-058 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 325 mm;
  • 12-21-059 - Process pipelines for main pipeline transport facilities for oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 377 mm;
  • 12-21-060 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 426 mm;
  • 12-21-061 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 530 mm;
  • 12-21-062 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 630 mm;
  • 12-21-063 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 720 mm;
  • 12-21-064 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 820 mm;
  • 12-21-065 - Process pipelines for objects of main pipeline transport of oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 1020 mm;
  • 12-21-066 - Process pipelines for main pipeline transport facilities for oil and petroleum products, mounted from pipes and finished parts of carbon steel for a nominal pressure of up to 10 MPa in trenches, with an outer diameter of 1220 mm.

Collection m37"General purpose equipment":

  • 37-01-037 – Installation of vertical and horizontal depreciation equipment in mine structures up to 40 meters deep;
  • 37-03-001 - Installation of equipment for a special lifting and locking mechanism protective device mine structures that open by rotating around a horizontal axis;

Federal collection of machine operation:

Book 91“Machines and Mechanisms” has been supplemented with the following resources:

  • 91.02.04-015 - Drilling and piling rigs on crawler tracks with a hydraulic hammer, drilling depth up to 17 m;
  • 91.03.05-041 - Universal roadheaders with hydraulic hammer and rock loading equipment, engine power 55 kW;
  • 91.03.05-042 - Universal roadheaders with hydraulic hammer and rock loading equipment, engine power 90 kW;
  • 91.05.06-027 - Imported crawler cranes, lifting capacity 750 tons;
  • 91.21.02-011 - Mobile units with an internal combustion engine for hydrocleaning of surfaces, productivity up to 1.2 m3/hour, pressure up to 100 MPa.

Federal collection of estimated prices for materials, products, structures and equipment used in construction:

Book 04“Concrete, mortars, construction and asphalt concrete mixtures” are supplemented with the following resources:

  • 04.3.02.09-0939 - Dry cement mixture with polymer additives, fiber, corrosion-protective, waterproofing, fire-resistant, for repairing concrete, reinforced concrete and stone structures;
  • 04.3.02.09-0940 - Dry cement primer sulfate-resistant mixture, for repairing concrete and reinforced concrete surfaces;

Book 14“Paint and varnish materials, anti-corrosion, protective and similar coatings, adhesives” is supplemented with the following resources:

  • 14.2.06.08-0011 - Dry primer mixture on a polymer silicate binder for a mineral silicated two-component mixture, component A;
  • 14.2.06.08-0012 - Dry mixture, corrosion-protective against acids (except hydrofluoric acid) based on polymer silicate for a mineral silicated two-component mixture, component A;
  • 14.2.06.08-0013 - Liquid additive based on polymer silicate for mineral silicated two-component mixture, component B;
  • 14.2.06.08-0021 - Paraffin-based product for the care of freshly laid coatings based on polymer silicates.

Not to say that a lot of information has been entered into the database; basically, all changes relate only to the addition of new prices to the database. There are no changes to existing prices.

As we can see, the Ministry of Construction of the Russian Federation is closely involved in finalizing state estimate standards, with the aim of further transition to the resource-based method of calculation based on data Read the next article

New databases of GESN and FER 2017 and other changes

Order of the Ministry of Construction of Russia dated January 24, 2017 No. 41/pro on amendments to the regulatory framework (state elemental estimate standards and federal unit prices) came into force on February 1, 2017.

Preliminary analysis of additions and changes to the new GESN and FER database as amended in 2017in the document.

A complete register of changes with links to orders (703/PR, 899/PR, 41/PR), names of collections and price numbers can be found download from link .
Protocol for comparing two databases: the new GESN and FER with additional 3 And old GESN and FER as amended in 2014 with additional 1-2.

The Union of Estimating Engineers proposes that the Russian Ministry of Construction make a strong-willed decision and cancel the “new” estimate standards, introduced by orders 1039/pr and 1038/pr dated December 30, 2016 (while temporarily leaving the additions and changes by order 41/pr dated January 24, 2017) and revise and supplement them by December 2017. Federal unit prices (FER) should be formed in prices as of 01/01/2018 based on monitoring data (FSIS Pricing) and new State estimate standards will be introduced from 01/01/2018.

President of the Union Pavel Goryachkin: “Such a decision would be very correct. We are ready, with the involvement of the expert community, to take an active part in the revision of estimate standards, for which we will not be ashamed later.”

The new GESNs and FERs have not yet produced anything revolutionary. Yes, it will be necessary to add a couple of “chips” regarding proposals to replace open resources in budget programs, but this has been the case in TSN for a long time. Bye new base looks like just another base, not a revolution.

Resource encoding has been changed.

646 new estimated standards have been added. 840 material resources excluded. Included 3,000 new materials and 90 vehicles.

The classifier is very interesting. In essence, these are FSSCs; OKPD2 will have to be added to them, and manufacturers will use it to report on current prices for resources. It will be loaded into the estimate program so that, in conjunction with production systems ("1C"), it will provide convenient reporting on current prices for its own produced resources.

  • Methodology for determining estimated prices for labor costs in construction;
  • Methodology for determining estimated prices for materials, products, structures, equipment and prices for services for the transportation of goods for construction;
  • Methodology for determining estimated prices for the operation of machines and mechanisms;
  • Methodological recommendations for the development of unit prices for construction, special construction, repair and construction work, installation of equipment and commissioning work;
  • Methodological recommendations for the development of state elemental estimate standards for equipment installation and commissioning;
  • Methodological recommendations for the development of state elemental estimate standards for construction, special construction and repair and construction work;
  • Methodology for applying estimated prices of construction resources;
  • Methodological recommendations for the development of indices for changes in the estimated cost of construction;

All these methods come into force on March 31, 2017 and you need to be very careful and have a lot of time to figure it out yourself. As an option -

FSNB-2001 is once again undergoing changes, but as they say - everything that is done is always for the better, only in motion - taking the next actions, we understand whether it is necessary to fiddle with the pricing reform or everything was fine! GESN and FER are now being improved at the state level, under the control of the Russian Ministry of Construction (Ministry of Construction and Housing and Communal Services of the Russian Federation). So, let's get acquainted!

GESN - State elemental estimate standards

Estimate and regulatory framework, collections of state elemental estimate standards for construction and special construction work. Estimated standard for individual elements of direct costs per unit volume of construction work and structural elements, consumption of building materials, labor costs of construction workers and operating time of construction machines.

FER – Federal unit prices

Estimation and regulatory framework, collections containing prices for the implementation of individual construction works, regulate those expressed in kind individual elements direct costs per unit volume of construction work and structural elements: consumption of building materials, labor costs of construction workers, operating time of construction machines.

GESN and FER 2017

Estimated standards (GESN) and unit prices (FER) were approved in accordance with orders 1038/pr and 1039/pr dated December 30, 2017, by the Ministry of Construction of Russia, whose activities are directly related to legal regulation in the construction industry.
  • Order No. 1038/pr dated December 30, 2017 - “On approval of estimate standards”
  • Order No. 1039/pr dated December 30, 2017 - “On approval of federal unit prices, federal estimated prices for materials, products, structures and equipment used in construction, federal estimated prices for the operation of construction machines and vehicles, federal estimated prices for the transportation of goods for construction."

GESN norms and FER prices

Designed to determine costs and draw up estimates on their basis for the production of the following works:

  • construction and special construction work;
  • installation of equipment;
  • major repairs of equipment;
  • commissioning works;
  • Repair Work.
  • Methodological recommendations for the development of state elemental estimate standards for construction, special construction and repair and construction work
  • Methodological recommendations for the development of state elemental estimate standards for equipment installation and commissioning
  • Methodological recommendations for the development of unit prices for construction, special construction, repair and construction work, installation of equipment and commissioning work

They are applied according to methods also approved at the end of 2016 at the beginning of 2017:

  • Guidelines for the application of federal unit prices for construction, special construction, repair and construction, equipment installation and commissioning work
  • Questions and answers

    To get acquainted with innovations you will have to spend time, but for simplicity and speed, we recommend attending seminars and contacting our consultants by any means of communication convenient for you.

    Prices and equipment

    Buy GESN and FER in the 2017 edition

    To purchase the FER 2017 regulatory framework, just send us your contact information by clicking the Buy button in the page header. We will contact you, agree on the package, delivery and payment options, and then, as soon as possible, we will ensure the launch of the database at your workplace.

    Price FER 2017

    The price of the estimate and regulatory framework has increased in relation to the FSNB edition of 2014 and varies from 10,000 to 20,000 rubles. depending on the need to update the database. For installation, we recommend using the services of On-Site or Remote Support specialists, in order to avoid wasting time, including on setting parameters for the correct operation of the GESN and FER estimate database in the estimate program.

    Price

    complete with estimate program Smeta.RU

    Due to the fact that the estimate and regulatory framework of GESN and FER on a territorial basis is applied throughout the Russian Federation, it seems possible to use it as part of the program Smeta.Region. This significantly saves money on purchasing a program for working with the database, but only in cases of drawing up estimate documentation in FER and one of the regional TEP databases. In cases of working with several regions, you should buy Smeta.RU. Our consultants will tell you more about the difference between the programs.

    Installation and training - free

    When you purchase the GESN and FER regulatory framework along with the program, we will bring you a complete license package for the program and base, install it on your computer and provide training on how to use it within 3 hours.

    Estimate program Quantity
    work places
    Price
    programs
    Price
    GESN and FER
    Price
    supplies
    Smeta.RU From 1 to 4 24,000 rub. 10,000 rub. 34,000 rub.
    Over 5 19,000 rub. 10,000 rub. 29,000 rub.
    Over 9 17,000 rub. 10,000 rub. 27,000 rub.
    Smeta.Region From 1 to 4 17,500 rub. 10,000 rub. 27,500 rub.

    Download GESN and FER

    in the format of the estimate program Smeta.RU

    To install the regulatory framework into the program, we strongly recommend that you contact specialists who will save your time for a small fee.

    Federal estimate and regulatory framework, 2017 edition

    • GESN and FER edition 2017 with changes 5 - 16.08.2019
      • GESN and FER edition 2017 with changes 4 - 02/12/2019
      • GESN and FER edition 2017 with changes 3 - 12/25/2017
      • GESN and FER edition 2017 with changes 2 - 10/26/2017

    !!! ATTENTION- according to the orders given on the description tab, the 2014 edition was valid until March 31, 2017

    Federal estimate and regulatory framework, 2014 edition

    Download GESN and FER in PDF format

    SNB GESN and FER in PDF format convenient for informational purposes or for checking prices in case of disagreement.

    Federal estimate and regulatory framework, 2017 edition

    The regulatory framework comes into force on April 28, 2017

      • Development history - release of add-on No. 1 is expected

    Federal estimate and regulatory framework, 2014 edition

    • GESN-2001 (edition 2014) - No. 3
    • FER-2001 (edition 2014) - No. 3

    History of development

    Addendum No. 5 to GESN and FER edition 2017

    Order No. 408/pr, 409/pr dated July 18, 2019

    Orders 408/pr and 409/pr dated July 18, 2019 approved and included in the federal register of estimate standards changes to federal unit prices for construction and special construction work and for installation of equipment, approved by order of the Ministry of Construction and Housing and Communal Services Russian Federation dated December 30, 2016 No. 1038/pr “On approval of estimate standards” (as amended by orders of the Ministry of Construction of Russia dated June 15, 2017 No. 886/pr, dated September 25, 2017 No. 1251/pr and No. 1254/pr, dated September 28, 2017 No. 1281/pr, No. 1283/pr, No. 1285/pr and 1287/pr, dated November 24, 2017 No. 1575/pr, dated January 10, 2018 No. 9/pr).

    Addendum No. 5 to the FER includes prices for the following collections:

    for construction and special construction work:
    • Collection 1. Earthworks,
    • Collection 9. Building metal structures,
    • Collection 10 Wooden structures,
    • Collection 12. Roofs,
    • Collection 16. Internal pipelines,
    • Collection 25. Main and Field pipelines,
    • Collection 27. Highways.
    for installation of equipment:
    • Collection 8. Electrical installations,
    • Collection 12. Technological pipelines.

    To receive updates, purchase a Subscription to GSN updates (GESN and FER) throughout the year.

    For questions about purchasing and installing updates, write or call our specialists.

    Addendum No. 4 to GESN and FER edition 2017

    Order No. 9/pr dated January 10, 2018

    Order 9/pr dated January 10, 2018 approved and included in the federal register of estimate standards changes to state elemental estimate standards for repair and construction work, approved by order of the Ministry of Construction and Housing and Communal Services of the Russian Federation dated December 30, 2016 M 1038/ pr (On approval of estimate standards) (as amended by orders of the Ministry of Construction of Russia dated June 15, 2017 No. 886/pr, dated September 28, 2017 No. 1281/pr), according to the appendix to the order.

    Additions have been made to collection 66 for repair and construction work:

    Section I. General provisions, supplemented with points:

    • 1.66.13 - about costs not taken into account in the standards of Table. 66-55;
    • 1.66.14 - on provisions for the operation of machines and mechanisms.
    Section III. State elemental estimate standards for repair and construction work, supplemented by the following standards:
    • GESNr 66-55 - Restoration of pipelines using a spiral-wound method with a steel-reinforced profile made of unplasticized polyvinyl chloride (IPIVH) with filling of the interpipe space

    Addendum No. 3 to GESN and FER edition 2017

    Order No. 1575/pr dated November 24, 2017

    Order 1575/pr dated November 24, 2017 approved and included in the federal register of estimate standards changes to state element estimate standards for construction and special construction work, including installation of equipment, approved by order of the Ministry of Construction and Housing and Communal Services of the Russian Federation dated December 30, 2016 M 1038/pr (On approval of estimate standards) (as amended by orders of the Ministry of Construction of Russia dated June 15, 2017 No. 886/pr, dated September 25, 2017 No. 1251/pr and No. 1254/pr, dated 28 September 2017 No. 1281/pr, No. 1283/pr, No. 1285/pr and No. 1287/pr), according to Appendix No. 1 and 2 to the order.